Sabotage Issue: Countach's Explanation
So you have read what Gobling had to say about the incident. Zaihas went to see Countach people earlier this evening to find out their side of the story, and below was what they had to say:
When the lights turned off halfway through Mister Calcium, Wek (studio owner) rushed upstairs to check the fusebox. Everything was okay, and when he went down, the power had been back on. A studio caretaker was changing his clothes at the moment, and the rest of the Countach boys were downstairs, so Wek did not think these kids were involved in it. Another caretaker rushed to the power sockets nearby the stage to make sure all connections were secured once the power got cut- none were problematic. So the power could only be cut off from inside the studio upstairs by switching off a connection.
There is one catch though. Despite repeated instructions from Wek not to let outsiders go up into the studio while the show was running, some kids from some other bands which were scheduled to play next went upstairs anyways and stayed there during Gobling's set.
So who was responsible for this immature behavior? Go figure. One day you'll get caught, putang ina. And we have yet to practise our wasabi making skill on a human being before.
2 Comments:
u can add me in your link page
James Lum @ Serpent
http://jameslum.blogspot.com/
No problem James. Will get it linked ASAP :)
Post a Comment
<< Home